OwnsteadSystems

Insights

Are your quotes priced on last quarter's steel? A 15-minute check for job shops

Most Texas manufacturers paid more for raw materials this fall, but far fewer raised their prices. Here's where that gap hides in a job shop's quotes, and a simple check you can run this week.

In the Dallas Fed's October survey of Texas manufacturers, 56.6% said they paid more for raw materials than the month before. Only 30% said they raised the prices they charge. (Texas Manufacturing Outlook Survey, October 2026)

Not every shop can pass costs on right away. Some customers are on fixed pricing, and some jobs were quoted months ago. But in a job shop, a lot of that gap comes from a smaller, fixable problem: the quote was built on old numbers.

Where the gap usually hides

1. Material prices typed in months ago. Most quoting spreadsheets have a tab of material prices: per pound, per foot, per sheet. Someone filled it in when the sheet was built and updates it "when there's time." Every quote since then has used those numbers.

2. Drops, scrap and setup that never make it into the price. A quote that prices the 40 inches of tube in the part, but not the 20-foot stick you had to buy, loses money on every small order. The same goes for first-article scrap and setup time on short runs.

3. Rush jobs priced like normal jobs. Expedited material, overtime and bumped schedules are real costs. If the quote doesn't change when the due date does, the shop pays for the rush.

A 15-minute check you can run this week

  1. Pull your last five quotes that turned into orders.
  2. Find the material cost in each one (the line, the cell, or the estimator's note).
  3. Compare it to your latest supplier invoice for the same material.
  4. If they're off, fix the source (the price tab, the template or the estimator's cheat sheet) before the next quote goes out.

Often the fix is one number in one cell, not a new system. But if you can't find where the material price came from, or three people would give you three different answers, that's worth knowing too.

Signs the problem is bigger than one cell

  • Material prices live in more than one place: the quote sheet, the estimator's head and the purchasing inbox.
  • You find out a job lost money only after it ships, if at all.
  • Nobody can say quickly what a finished job actually cost compared with what it was quoted at.

When those show up, the issue usually isn't the estimator. It's that quoting, purchasing and the shop floor don't share the same numbers. That's the kind of problem we help with at Ownstead: we build business systems around how your shop already works, and we run them alongside what you use today until the numbers agree.

Frequently asked questions

How often should a job shop update material prices in its quotes?
At least as often as your suppliers change prices. When metal prices are moving, check your main materials monthly. Check right away on any quote large enough to hurt if you're wrong.

Should quotes include the cost of drops and remnants?
If you can't reliably use the leftover on another job, yes. Price the material you have to buy, not just the material that ends up in the part.

What's the fastest way to know whether quotes are losing money?
Compare quoted cost with actual cost on your last few finished jobs: material from invoices, and labor from time records or travelers. Even a rough comparison on five jobs shows whether you have a problem.

---

Want a second set of eyes on how your shop quotes? Email me at alec@ownsteadsystems.com. Happy to look, no pitch.

quotingmaterial costsjob shopmarginsTexas